TM 10-4320-303-132.3.4 LeadPumpingStationAssembly .(Continued)CAUTIONTo prevent leakage, close both cam arms at the same time. Do not strike camarms to close. Damage to couplings could result.p. Connect last 6 inch suction hose assembly (5) to Y-connection reducer (6) (6 inch x 4 inch x 4 inch).Close cam arms.q. Connect Y-connection reducer (6) to water source. Close cam arms.2.3.5 BoostPumpingStationAssembly .Each boost pumping station assembly requires one trailer-mountedpumping assembly, and the tools, personnel, and components listed below. Remove the required componentsfrom the "PUMPING STATION" crate. Perform inspections of each part for damage and operability.2.3.5.1 AssemblyRequirements.ToolsUsedToRubber Mallet and Clamping Tool (ItemsInstall 6 inch grooved-end pipe quick157 and 3, Appendix C)disconnect coupling clamps.PersonnelTwo requiredComponentsTable 2-10. Components Required From Pumping Station Crate for Assembly of Boost PumpingStation.QtySizeItem36 inchButterfly valve16 inchCheck valve16 inch x 10 footHose assembly16 inch x 20 footHose assembly16 inch x 75 footHose assembly126 inchGrooved-end pipe quick disconnectcoupling clamp26 inchLateral grooved pipe fitting16 inchPressure relief valve and nipple2.3.5.2 AssemblyandInstallationProcedures. Refer to applicable technical manual for assembly,installation, and preparation for use of the model 600 gpm pumping assembly supplied with your TWDS.2-44
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business