TM 10-4320-303-13Figure 2-20. Boost Pumping Station and Bypass Components Assembly.l. Install 6 inch butterfly valve (Figure 2-20, 2) on end of lateral grooved pipe fitting (4) (on suction line ofboost pumping station) with grooved-end pipe quick disconnect coupling clamp (3) (para 2.3.3.2).m. Install 6 inch x 75 foot discharge hose assembly (7) on end of 6 inch butterfly valve (2) with grooved-end pipe quick disconnect coupling clamp (1) (para 2.3.3.2).n. Install 6 inch x 75 foot discharge hose assembly (7) on end of lateral grooved pipe fitting (5) (ondischarge line of boost pumping station) with grooved-end pipe quick disconnect coupling clamp (6)(para 2.3.3.2).2.3.6Assembly of Storage Assemblies . Assembly of a storage assembly requires the tools, personnel, andcomponents listed below. Remove the required components from the "STORAGE ASSEMBLY" crate.Perform inspections of each part for damage and operability. Refer to applicable technical manual for theassembly, installation, and preparation of use for the 20,000 gallon pillow tank.2.3.6.1 Assembly Requirements.ToolsUsedToRubber Mallet and Clamping Tool (ItemsInstall 6 inch and 4 inch grooved-end157 and 3, Appendix B)pipe quick disconnect coupling clampsPipe wrench 2-7/8 inch minimum and 4Install components with threadedinch maximumfittings. (Notify unit maintenanceto install components with threadedfittings).PersonnelTwo required2-47
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business