TM 10-4320-303-13
Figure 2-33. Breakaway Installation.
r. Repeat steps 1 through q for other three flaking boxes.
2.3.8.5 Hose Laying and Installation .
CAUTION
After removing components from boxes, be sure to protect them from sand and grit.
NOTE
Remove caps or packaging material from ends of hose.
a. Remove 6 inch grooved pipe coupling (para 2.3.2.1) from leading ends of hose assemblies in flaking
boxes (Figure 2-34, 1, 2, 3,.and 4).
CAUTION
After removing components from boxes, be sure to protect them from sand and grit.
b. Connect leading end of hose in flaking box four (figure 2-34, 4) to trailing end of hose in flaking box
three (3) with 6 inch grooved pipe coupling (para 2.3.2.2).
2-67