TM 10-4320-303-13
2.3.8 Assembly of 10-Mile Hoseline Segment. (Continued)
g. Listed below are the total number, size, and type of components packed in the "10-MILE HOSELINE
SEGMENT" crate. Remove the components needed to complete the assigned mission. Perform
inspection of each part for damage and operability.
Table 2-13. Components Required from 10-Mile Segment Crate for Assembly of 10-Mile Hoseline
Segment.
Qty
Size
Item
1
Displacement and evacuation kit
1
6 inch
End cap
15
6 inch
Grooved pipe coupling
1
Lifting sling
1
Packing kit
1
Pressure-reducing valve, skid mounted
1
6 inch
Pressure relief valve and nipple
1
Repair Kit
24
5 foot
Road crossing guard
4
1-1/4 inch
Socket wrench
4
Socket wrench handle
5
Suspension kit
65
6 inch
Swivel joint and coupling
Figure 2-30. Loading and Securing Flaking Boxes.
2.3.8.4 Preparation for Hose Laying. To prepare for hose laying, flaking boxes (Figure 2-30, 1) are first
loaded on truck. A forklift or crane with lifting sling (2) is used for loading. Remove flaking boxes (1) from
crate and proceed as follows: