TM 10-4320-303-132.3.8 Assembly of 10-Mile Hoseline Segment. (Continued)g. Listed below are the total number, size, and type of components packed in the "10-MILE HOSELINESEGMENT" crate. Remove the components needed to complete the assigned mission. Performinspection of each part for damage and operability.Table 2-13. Components Required from 10-Mile Segment Crate for Assembly of 10-Mile HoselineSegment.QtySizeItem1Displacement and evacuation kit16 inchEnd cap156 inchGrooved pipe coupling1Lifting sling1Packing kit1Pressure-reducing valve, skid mounted16 inchPressure relief valve and nipple1Repair Kit245 footRoad crossing guard41-1/4 inchSocket wrench4Socket wrench handle5Suspension kit656 inchSwivel joint and couplingFigure 2-30. Loading and Securing Flaking Boxes.2.3.8.4 Preparation for Hose Laying. To prepare for hose laying, flaking boxes (Figure 2-30, 1) are firstloaded on truck. A forklift or crane with lifting sling (2) is used for loading. Remove flaking boxes (1) fromcrate and proceed as follows:2-64
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business