TM 10-4320-303-13
2.3.7 Assembly of Distribution Points. (Continued)
Figure 2-26. Hypochlorination Unit.
az. Store color comparator kit in metal box (Figure 2-26, 1) mounted on skid of hypochlorination unit (2).
Figure 2-27. Tripod Stand Assembly.
ba. Install two nozzle stand assemblies (Figure 2-27, 1). Spread three tripod legs (2) and secure legs with
rocks or embed pointed ends in ground. Locate nozzle stand assemblies (1) at convenient spots for
hanging distribution point nozzles (3) and elbow valves (4).
2-60