i.
Hose and Nozzle Kit Assembly
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
(9)
(10)
(11)
(12)
To prevent contamination of drinking water, make sure protective
caps and plugs are installed in component when not in use.
NOTE
Install all gate valves with hand wheel in upright position and valve fully
closed.
Three hose and nozzle kits are supplied with the 40K Water Distribution
System. These kits are connected to the bag filler connection kit at con-
nection points F-F, G-G, and H-H.
Connect reducer (78) to hoses at connection point F-F, G-G, or H-H on bag filler connection kit.
Connect discharge hose (79) to reducer (78).
Connect discharge hose (80) to discharge hose (79).
Position pressure regulator (81) near discharge hose (80). Connect discharge hose to regulator.
Connect discharge (82) to pressure regulator (81).
Connect discharge hose (83) to discharge hose (82).
Connect distribution nozzle (84) to discharge hose (83).
Unfold nozzle stand (85) and place distribution nozzle (84) on hanger.
Repeat steps 1 through 8 for two remaining hose and nozzle kits.
Connect reducer (77) of one hose and nozzle kit to discharge hose (70) (point F-F) on
bag filler kit.
Connect reducer (77) of second hose and nozzle kit to discharge hose (71) (point G-G) on bag
filler kit.
Connect reducer (77) of third hose and nozzle kit to discharge hose (73) (point H-H) on bag filler
kit.