SERVICE MANUAL
CYLINDER HEAD & VALVES
Section 3
Figure 11. - Cylinder Head and Valve Lever Assembly
1.
Fuel return line
5.
Valve cover
2.
Nozzle holders
6.
Bolts (6)
3.
Capscrews
7.
Push rods
4.
Nozzle assemblies
8.
Bolts (20)
8.
Insert 15 inch pry bar at left front side of cylinder
head, between indentation of cylinder head and
crankcase. Break seal formed by head gasket
sealant prior to hoisting.
Pry with a rolling motion as shown in Fig. 12. (See
NOTE).
NOTE: New style head gaskets with premeasured
sealant Figure 40, does not require this procedure.
CGES-185-3
PRINTED IN UNITED STATES OF AMERICA
Page 13