SERVICE MANUAL
DISASSEMBLY
Section 2
Figure 9. Removing Guide Pin
1.
Slotted Screw Guide Pin
6.
Remove six governor cover screws and take off
governor cover (Figure 10). Lift cover up and
operate control lever to release internal linkage.
7.
Remove pin retaining clip and link pin and
disconnect floating lever from rack link.
8.
Pull top of floating lever back and down to
remove floating lever and slider (Figure 11) from
guide bushing.
NOTE: U sing a rubber band or wire around delivery
valve secure rack link-up to prevent link damage (Figure
11).
Figure 10. Removing Governor Cover
1.
Cover
3.
Rack Link
2.
Link Pin
4.
Floating Lever
Figure 11. Removing Floating Lever and Slider
1.
Floating Lever
3.
Slider
2.
Guide Bushing
4.
Rubber Band or
Wire
9.
Raise tabs on lock washer and remove double
nutted thru-bolt and guide bushing from governor
flyweight assembly (Figure 12).
10.
Raise tabs on lock plates, remove two cap
screws and take out guide bushing (Figure 13).
Figure 12. Removing Thru-Bolt from Flyweight
Assembly
1.
Thru-Bolt
3.
Guide Bushing
2.
Flyweight Assembly
CGES-375
Printed in United States of America
Page 7