TM 5-3895-370-14&P
2-9. PREPARATION FOR OPERATION (CONT).
(5)
Connect distributor intervehicular electrical cable (7) to tow vehicle electrical receptacle (8).
(6)
Remove both left and right chock blocks
(9) and stow in brackets (10).
(7)
Unhook three latches (11) securing control
console cover (12) on control console
(13).
(8)
Remove cover (12) and stow in bracket
(14) on back of console (13).
2-20