TM 5-3895-370-14&P(9)Remove fourwing nuts (15) andgage panel cover (16) from gagepanel (17).(10)Perform operator PMCSprocedures designated Before inthe Interval column (Table 2-2).e.Pre-Start Adjustments.WARNING·The bituminous distributor can be a dangerous piece of equipment. Prior tostarting the distributor, make sure all operational maintenance instructionshave been followed, all operating procedures have been reviewed, and allsafety and warning notes have been adhered to.·Hearing protection required for personnel within 16 feet of this equipmentwhen in operation.2-21
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business