B - Before
D - During
A - After
W - Weekly
M - Monthly
Item
Interval
Item to Be
Procedure
Check for and have repaired or
Equipment is Not
Ready/Available
No.
B D A W M
Inspected
adjusted as necessary
If:
TM 5-3895-370-14&P
2-8. OPERATOR PMCS TABLE (CONT).
Table 2-2. Operator Preventive Maintenance Checks and Services - CONT.
NOTE:
Within designated interval, these checks are to be performed in the order listed.
CONTROL
CONSOLE-
CONTINUED
51
Gage Panel
Visually inspect for damaged gages
Obvious damage to gages or
or switches.
Switches.
52
Control Console
Visually inspect for damaged
Obvious damage to levers,
levers, meters, or switches
meters, or switches.
CAUTION
Do not operate bituminous
pump for longer than 60
seconds
without
pumping
material.
53
Pump
Slowly move control lever forward
Levers bind or pump lever will
Transmission
(FWD) to ensure free pump
not engage.
Control Lever
operation (para 2-02).
BITUMINOUS
SYSTEM
54
Bituminous
Operate bituminous system
System
(para 2-20) and check for the
Operation
following:
a.
Ensure flow meter is operating
a.
Flow meter does not
operate.
54
Bituminous
Operate bituminous system
System
(para 2-20) and check for the
Operation-
following
Continued
b
Ensure bituminous mater
b.
Bituminous material not
flows through system
flowing at set rate or not at
all.
c.
Inspect for signs of leakage in
c.
Class III bituminous
system.
Material leakage is present.
2-16