TM 5-3895-370-14&P5-49. HYDRAULIC VALVE BANK ASSEMBLY REPAIR (CONT).NOTEThis task shows the disassembly ofone valve body. The procedure is thesame for the remaining three valvebodies.(5)Disassemble valve body (7) as follows:(a)Remove four preformed packings (9 and10). Discard preformed packings.(b)Remove two screws (19), lever bracket(20), and preformed packing (21). Discardpreformed packing.(c)Remove two dowel spacers (22) fromlever bracket (20).(d)Remove retainer (23).5-174
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business