TM 5-3895-370-14&P
5-53
BITUMINOUS PUMP REPLACEMENT/REPAIR.
This task covers:
a. Removal
c. Cleaning/Inspection
e. Installation
b. Disassembly
d. Assembly
INITIAL SETUP
Tools
Materials/Parts - Continued
Shop equipment, automotive maintenance and
Solvent, drycleaning (item 50, Appendix E)
repair: organizational maintenance supplemental
Lockwashers (4)
no. 1, less power
Preformed packing (7)
Head gasket
Shop equipment, automotive maintenance and
Idler bushing
repair: organizational maintenance common
Bracket bushing
no. 1, less power
Bracket gasket
Shop equipment, automotive maintenance and
Personnel Required
repair: field maintenance, supplemental no. 1,
MOS 62B, Construction equipment repairer (3)
less power
Equipment Condition
Jacking screws (2) (7/16 x 2 1/12 - 14 UNC)
TM or Para
Condition Description
Para 5-55
Bituminous pipes
Suitable lifting device (600 lb [272 kg] capacity)
removed.
Para 5-52
Coupling and gear
Gloves, protective thermal
removed.
Para 5-48
Hydraulic motor
Materials/Parts
removed.
Compound, sealing (item 15, Appendix E)
Para 5-58
Pump heating
Grease, general purpose (item 23, Appendix E)
chamber removed.
Oil, lubricating (item 34, Appendix E)
5-189