ENGINE DIVISION SERVICE MANUALELECTRICALFig. 5. Cranking Voltage testTestNo2-BatteryCapacityTestThe battery capacity test is per-formed to determineif the battery is in satisfactory condition. See "Battery"Section B. If the battery passes this test, continue thenext test.TestNo3-VoltageDropTestGenerally, the starting or cranking circuit is a seriescircuit from the battery insulated post to the startingmotor solenoid, to the motor, to ground (chassis) andreturn to the battery ground post, Fig. 6.In the cranking circuit we also have a crankingcontrol circuit, Fig. 6. In this circuit the solenoid iscontrolled or operated by closing an ignition switch orpush button starting switch at the instrument panel. Inthis cranking control circuit there are frequently somesafety switches such as transmission "neutral safetyswitch" and/or vacuum-operated cutout switch.CGES-230 - Page 6PRINTED IN UNITED STATES OF AMERICA
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business