TM 5-3895-370-14&P(6)If removed, install eight cage nuts (6) on twobase bars (5).(7)Position two base bars (5), side panels (4), andfront panel (2) on bituminous pump (3).(8)Install 17 screws (1) on two base bars (5), sidepanels (4), and front panel (2).NOTEFollow-on maintenance: Install toolbox (para 4-126).END OF TASK5-223
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business