TM 5-3895-370-14&P
(6)
If removed, install eight cage nuts (6) on two
base bars (5).
(7)
Position two base bars (5), side panels (4), and
front panel (2) on bituminous pump (3).
(8)
Install 17 screws (1) on two base bars (5), side
panels (4), and front panel (2).
NOTE
Follow-on maintenance: Install toolbox (para 4-126).
END OF TASK
5-223