TM 5-3895-370-14&P
5-62. GATE VALVE ASSEMBLY REPAIR (CONT).
(6)
Install cap (10) on valve body (8).
NOTE
Install preformed packings with one
bevel edge towards stuffing box and
one bevel edge towards gland.
(7)
Install two preformed packings (9) in stuffing box
(6).
(8)
Install stuffing box (6) and two preformed
packings (9) on stem (7).
(9)
Install gland (5), gland spring (4), and nut (3) on
stem (7).
(10)
Install handle (2) and tighten handle nut (1).
NOTE
Follow-on maintenance: Install gate valve (para 5-59).
END OF TASK
5-252