TM 5-4320-301-13&P
TM 08936A-13&P/1
Section V
ORGANIZATIONAL MAINTENANCE PROCEDURES (Contd.)
4-11.
NOZZLE DISTRIBUTION ASSY, REPLACEMENT (Contd.)
INSTALLIION
a.
If nozzle body (4) is cracked or damaged replace water distribution nozzle.
b.
Wrap threaded end of swivel (3) with one layer of teflon tape ST410.
c.
Wrap threaded end of female quick-disconnect reducer (2) with one layer of teflon tape ST410.
d.
Install female quick-disconnect and reducer (2) in swivel (3).
e.
Install swivel (3) in threaded end of nozzle body (4).
f.
Attach dust plug (5), chain and retaining ring (6) to female quick-disconnect reducer (2).
4-14 Change 8