TM 5-4320-301-13&P
TM 08936A-13&P/1
Section V
ORGANIZATIONAL MAINTENANCE PROCEDURES (Contd.)
4-12.
STAND ASSY, REPAIR. (Contd.)
INSTALLION
a.
Install two clevis legs (5) on pivot leg (3) with clevis pins (4).
b.
Install two cotter pins (6) and bend back around heads so they will not snag on clothing or hoses.
c.
Install new or repaired sash chains (2) with s-hooks (1) to stand legs (3/5).
d.
Bend shook inward with a pair of common pliers and return stand to service.
e.
Install stand assy back in FAWPSS system.
Change 8 4-17