TM 5-4320-301-13&P
TM 08936A-13&P/1
Section V
ORGANIZATIONAL MAINTENANCE PROCEDURES (Contd.)
4-13.
HOSE ASSYS, REPAIR (CONT).
f.
Bend band back over buckle teeth and release tension handle.
g.
Cut band with tools cutting handle (1) while holding end of band down with thumb (2).
h.
Secure stub by tapping prongs of buckle down with a hammer (3).
i.
Repeat steps a. through h. for each clamp installed.
j.
Install new gasket in female coupling halves and dust caps.
k.
Attach dust caps and plugs on the hose assy.
l.
Reinstall in water distribution system in the reverse order of removal.
4-20 Change 8