TM 5-5430-211-13 & P
3-19 4 INCH GATE VALVE ASSEMBLY - CONTINUED
ITEM
ACTION
REMARKS
INSTALLATION - CONTINUED
2. Male coupling half
Repeat the above procedures to
replace the male coupling half on
the gate valve.
3. Hoses
Recouple the gate valve
assembly to the hoses.
Push the camlock arms into the
locked position.
Replace gate valve on the
ground.
4. Completed Assembly
Check for leaks when water flow
begins again.
3-66