TM 5-5430-211-13 & P
4-5 PERMANENT REPAIR OF DAMAGE TO TANK BODY
This task covers:-
Patching of holes and tears to the tank body which are too large to be repaired by Organizational Maintenance using
the standard Repair Kit.
INITIAL SETUP
Test Equipment
Materials/Parts
None
Tools
Scissors
Brush, hand
Roller, small
Troubleshooting Reference
Para 3-10
Equipment Condition
Tank must be empty and allowed to dry
for 3 days.
4-2