3-23 PACKING OF TANK - CONTINUED
2
Roll up the tank using the nylon webbing for assistance.
3
Secure the roll with tape or ties.
4
Roll the tank onto the container base.
5
Add the boxed repair kit and repair items.
6
Add the drain hose and valve.
7
Add the 4 inch gate valve and other metals from the tank.
8
Overpack the manual.
9
Lift on the container superstructure.
10
Replace the lag bolts.