TM 5-5430-211-13 & P3-23 PACKING OF TANK - CONTINUED2Roll up the tank using the nylon webbing for assistance.3Secure the roll with tape or ties.4Roll the tank onto the container base.5Add the boxed repair kit and repair items.6Add the drain hose and valve.7Add the 4 inch gate valve and other metals from the tank.8Overpack the manual.9Lift on the container superstructure.10Replace the lag bolts.3-69(3-70 blank)
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business