SERVICE MANUALCALIBRATIONSection 5Before mounting pump on stand remove access plugwith screwdriver bit KDEP 2949. Remove fuel inletadapter and plug opening with bushing 1 413 462 040and copper gasket 2 916 710 611 so it is flush with pumphousing.ESTABLISH PORT CLOSURE ON NO. 1 CYLINDER1. Mount pump on stand and install rack dial indicator 1687 233 015, bracket 1 688 130 030, adapter bushing 1683 350 065 and rack pin 1 683 201 013 (Figure 2).Figure 2. Installing Dial Indicator (Rack Gauge)1.Bracket 1 688 130 030 with AdapterBushing 1 683 350 065 and Rack Pin 1 683201 013.2.Dial Indicator 1 687 233 0152.Zero dial indicator when rack is pushed to shut-off. Be sure rack does not bottom out onindicator. Move throttle lever to max. positionTotal rack travel should be as specified onindividual pump calibration chart for starting fueldelivery (Step 17).3.Move rack out of starting fuel position with shut-off lever. Dial indicator should read about 10mm 2 mm.4. Mount lift-to-port closure measuring device 1 688130 135 with dial indicator 1 687 233 012,adapter bushing 1 683 350 066 and tappet pin 1682 012 008 to pump (Figure 3). Make suretappet number one is at bottom dead center(B.D.C.). The plunger lift-to-portclosure is the distance in mm from the B.D.C. position ofthe cam to port closing by the plunger. Lift-to-portclosure is only measured at element number one.Subsequent elements are phased at 60 degree intervals(see Step 10).5.Zero the dial indicator at bottom dead centerposition of the roller tappet.IMPORTANTHIGH PRESSURE PHASINGISRECOMMENDED. (FOR LOW PRESSUREPHASINGREMOVE DELIVERY VALVE,SPRING AND WASHER. UPONREPLACEMENT, NEW DISCHARGE FITTINGAND GASKET AT BOTTOM OF DELIVERYVALVE ARE REQUIRED EACH TIME ASTHEY ARE A ONE-TIME TORQUE DESIGN).Figure 3. Establishing Initial Plunger Lift (No. 1 PumpingElement)1.Dial Indicator 1 687 233 0122.Plunger Lift Device 1 688 130 135 with Pin1 682 012 008 and Adapter Bushing 1 683350 066.6.With the bleeder screw open at number onecalibrating nozzle holder assembly, increasefeed pressure until calibration fluid comes out ofoverflow tube with no bubbles.7.Turn camshaft slowly in direction of rotation(clockwise) until port closure is reached. Portclosure is reached when the flow of calibratingfluid from nozzle holder overflow tube changesfrom a steady stream to drops.CGES-375Printed in United States of AmericaPage 2
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business