SERVICE MANUALCALIBRATIONSection 58.Read dial indicator for proper lift (see CalibrationChart for specification). Zero the pump standdegree wheel at this point for phasing. Returntappet to B.D.C. and repeat Steps 6 and 7 toensure repeatability.9.Compensate for deviation from the specifiedmeasurement by inserting the proper sizeadjusting spacer (available in thickness steps of0.05 mm) between the barrel flange and pumphousing (Figure 4).IMPORTANTADJUSTING SPACERS OF THE SAMETHICKNESS MUST BE USED ONBOTH SIDES OF BARREL AND VALVEASSEMBLY AND ONLY ONE SPACERSHOULD BE USED ON EACH SIDE.Figure 4. Inserting Adjusting Spacers1.Adjusting SpacersPHASING10.Check port closure for the remaining plungers inpump discharge order by rotating the camshaftin 60 degree intervals.No. 1No. 5No. 3No. 6No. 2No. 4060± 1/20120± 1/2180± 1/2240± 1/2300± 1/2At each of these intervals check port closure asoutlined in Steps 7 and 8 (nozzle bleeder screwopening to correspond with element number).11.If port closure is not exactly as specified 1/2degree, adjust by selecting proper spacer forunder the barrel flange. If port closure occurstoo early, increase spacer thickness. If too late,reduce spacer thickness.0.05 mm spacerequals 0.2°.GOVERNOR ADJUSTMENT12.Insure zero dial indicator setting as outlined inStep 2. Adjust shut-off lever stop screw (Figure5) to 1.5 - 2.0 mm (.060 - .079") rack position.Figure 5.1. Shut-off Lever Stop ScrewCGES-375Printed in United States of AmericaPage 3
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business