TM 5-3895-370-14&P
4-158. SIDE JOINT SECTION REPLACEMENT.
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Tools
Personnel Required
Tool kit, general mechanic's: automotive
MOS62B, Construction equipment repairer (2)
Materials/Parts
Equipment Condition
Gaskets (3)
TM or Para
Condition Description
Cotter pins (3)
Para 4-84
Negative battery cable
Lockwashers (5)
disconnected.
Fiber washers (4)
Para 4-157
Tension spring removed.
a. Removal
NOTE
There is a left and right side joint
section. The following steps remove
the left side joint section. The
procedure
is
the
same
for
both
sections.
(1)
If damaged, remove four nuts (1), two clamps (2),
thimble (3), and wire rope assembly (4) from
spraybar center section (5).
4-451